Elevating Expectations for Hotel Construction

"We saved at least three months...(and) I didn't have to provide housing for a framing crew of 20, nor full plumbing or electrical crews...."

Andy Wallen
General Manager
Passages Resorts

By Using Modular to Solve Construction Challenges, Mountaintop Hotel Opens Three Months Early

A short building season, few qualified crews and a hard-to-reach mountain setting posed challenges to the developer. Genesis modular construction helped overcome these obstacles while accelerating the building of this 48-room resort hotel by three months over site-built methods.

Client

Passage Resorts

Project Type

Mountaintop Hotel

Builder

Genesis Homes in York, Nebraska

Project Scope

  • Modular units flank a site-constructed central lobby
  • 48 hotel units of which two are Genesis-designed handicap units
  • Genesis crews provided factory construction and site installation
  • 30-day construction schedule met

Challenge

Overcome a difficult-to-reach setting, 8,700 feet above sea level, and local skilled labor shortage to complete mountaintop hotel units before fast-approaching winter halted construction.

 

Solution

  • Genesis in-plant modular construction eliminated the need to have building materials delivered to the hard-to-reach site.
  • Genesis' own crews installed and weather-sealed units on site in only 15 days.
  • Time between start of construction in the plant to on-site installation was only 30 days.
  • Hotel units were weather-tight before onset of winter

Project Spotlights

Elevating Expectations for Hotel Construction (Sheridan, Wyoming)

A short building season, few qualified crews and a hard-to-reach mountain setting posed challenges to the developer for this mountain-top hotel. Genesis modular construction helped overcome these obstacles.

  Click to Find Out More... 



Cashing in on the Benefits of Modular Construction (Fairlawn, Virginia)

For Turn-Key Financial, a fast-changing banking retail market and an unusually severe Virginia winter were no barrier to completing a new bank branch ahead of schedule. Using Genesis modular construction, the builder completed the bank more than 1/3 faster compared to typical on-site construction

  Click to Find Out More... 



Innovative Application of Modular Construction for Residential-Over-Retail Building - The Greene (Beavercreek, Ohio)
Employing modular construction methods allowed retail tenants to open for business quicker and residents to move in ahead of schedule

 Click to Find Out More...